IEP expertly packed and secured three sets of pipes, each weighing a total of 40 tonnes, for the Oil and Gas industry. The pipes were placed on a 12×6 railed base, blocked out around the edges to prevent movement and support the base during lifting. A frame was then positioned on top of the pipes, holding them firmly in place with flush grabs. To protect against moisture damage, the pipes were sealed inside a foil bag containing silica gel. Finally, the case was completed with a tarpaulin sheet covering the lid, providing an additional layer of protection against water damage during transit. This careful packing ensures the safe delivery of these critical components for a leading UK manufacturer.